1 00:00:22,960 --> 00:00:20,830 I'm Lori Meggs and welcome to focus on 2 00:00:24,519 --> 00:00:22,970 Marshall on today's episode I'm on 3 00:00:26,109 --> 00:00:24,529 location at Kennedy Space Center in 4 00:00:28,060 --> 00:00:26,119 Florida where we'll take a look at a few 5 00:00:30,130 --> 00:00:28,070 of the ways marshall center employees 6 00:00:32,170 --> 00:00:30,140 participate in integration and launch 7 00:00:35,229 --> 00:00:32,180 activities here at the Cape so let's get 8 00:00:36,700 --> 00:00:35,239 started we've come inside the vehicle 9 00:00:38,470 --> 00:00:36,710 assembly building now and i'm joined by 10 00:00:40,060 --> 00:00:38,480 jolene martin she's the manager of 11 00:00:41,709 --> 00:00:40,070 Marshalls resident office here at 12 00:00:43,510 --> 00:00:41,719 Kennedy Space Center and Jolene you have 13 00:00:45,549 --> 00:00:43,520 a lot of employees here doing martial 14 00:00:47,410 --> 00:00:45,559 work to support NASA's mission that's 15 00:00:49,360 --> 00:00:47,420 right there's about 20 of us located 16 00:00:51,430 --> 00:00:49,370 here at Kennedy Space Center and we 17 00:00:53,979 --> 00:00:51,440 represent the design center for the 18 00:00:56,829 --> 00:00:53,989 propulsion elements and we do work here 19 00:00:58,360 --> 00:00:56,839 such as assist KSC in processing in 20 00:01:00,040 --> 00:00:58,370 several different facilities around this 21 00:01:01,479 --> 00:01:00,050 area so all of those elements come 22 00:01:02,799 --> 00:01:01,489 together in this building and you guys 23 00:01:03,969 --> 00:01:02,809 act as consultants for the people who 24 00:01:06,040 --> 00:01:03,979 are putting all the pieces of that 25 00:01:08,380 --> 00:01:06,050 puzzle together that's a way to look at 26 00:01:11,770 --> 00:01:08,390 it is that as like we're consultants for 27 00:01:14,680 --> 00:01:11,780 KSC who is actually processing the 28 00:01:16,270 --> 00:01:14,690 hardware and in the VA be here all the 29 00:01:18,250 --> 00:01:16,280 elements come together except for 30 00:01:20,950 --> 00:01:18,260 possibly the payloads the payloads come 31 00:01:23,920 --> 00:01:20,960 together in the OPF or in the pad the 32 00:01:25,420 --> 00:01:23,930 external tank solid rocket boosters the 33 00:01:27,850 --> 00:01:25,430 Space Shuttle main engines which are 34 00:01:29,530 --> 00:01:27,860 already attached to the orbiter are all 35 00:01:30,850 --> 00:01:29,540 assembled in this building but you guys 36 00:01:32,890 --> 00:01:30,860 do a lot of work before those pieces 37 00:01:35,770 --> 00:01:32,900 ever get to this building right and we 38 00:01:38,590 --> 00:01:35,780 should do we have facilities or i should 39 00:01:40,720 --> 00:01:38,600 say KSC has facilities that marshall is 40 00:01:43,150 --> 00:01:40,730 there to assist in any way when we see 41 00:01:44,620 --> 00:01:43,160 some of those i'd love to show you i'm 42 00:01:46,300 --> 00:01:44,630 here with tom angler and he's with 43 00:01:47,830 --> 00:01:46,310 Marshalls solid rocket booster project 44 00:01:49,420 --> 00:01:47,840 he's actually the manufacturing 45 00:01:51,190 --> 00:01:49,430 operations lead here at Kennedy Space 46 00:01:53,440 --> 00:01:51,200 Center in time it looks like we're going 47 00:01:54,880 --> 00:01:53,450 on a trip nice boat it is a nice boat 48 00:01:55,900 --> 00:01:54,890 but unfortunately we can't go along on 49 00:01:57,460 --> 00:01:55,910 their next trip they're getting ready to 50 00:01:59,320 --> 00:01:57,470 go retrieve the Boosters after our next 51 00:02:00,910 --> 00:01:59,330 flight and they actually go out to sea 52 00:02:02,590 --> 00:02:00,920 and wait for those solid rocket boosters 53 00:02:04,270 --> 00:02:02,600 to splashdown after launch right they 54 00:02:05,590 --> 00:02:04,280 sure do they're about 150 miles off the 55 00:02:07,270 --> 00:02:05,600 coast of Florida waiting for the 56 00:02:08,889 --> 00:02:07,280 Boosters come down and after the booster 57 00:02:10,930 --> 00:02:08,899 splashdown they'll they'll retrieve the 58 00:02:13,089 --> 00:02:10,940 parachutes and tow the Boosters back 59 00:02:17,020 --> 00:02:13,099 here to hang RAF can we go see hang RAF 60 00:02:18,220 --> 00:02:17,030 absolutely so Tom this is hangar AF sure 61 00:02:19,870 --> 00:02:18,230 is this is where we perform our 62 00:02:21,940 --> 00:02:19,880 disassembly operations after our 63 00:02:23,110 --> 00:02:21,950 retrieval process is complete we bring 64 00:02:24,190 --> 00:02:23,120 the Boosters here into the hangar on 65 00:02:26,650 --> 00:02:24,200 these rail cars that are 66 00:02:28,509 --> 00:02:26,660 Linus and we take them apart the motor 67 00:02:30,190 --> 00:02:28,519 components are sent back out to ATK in 68 00:02:32,290 --> 00:02:30,200 Utah and the booster components stay 69 00:02:34,030 --> 00:02:32,300 here are cleaned up and repainted and 70 00:02:35,770 --> 00:02:34,040 sent over to our assembly refurbishment 71 00:02:38,080 --> 00:02:35,780 facility all right let's go see that too 72 00:02:39,550 --> 00:02:38,090 great let's go all right time you 73 00:02:41,500 --> 00:02:39,560 brought us over to another facility now 74 00:02:42,580 --> 00:02:41,510 what goes on here this is our solid 75 00:02:44,050 --> 00:02:42,590 rocket booster assembly and 76 00:02:45,580 --> 00:02:44,060 refurbishment facility in what we do 77 00:02:47,410 --> 00:02:45,590 here is the manufacturer of the solid 78 00:02:48,729 --> 00:02:47,420 rocket booster components to prepare 79 00:02:50,949 --> 00:02:48,739 them for flight and transfer over the 80 00:02:52,690 --> 00:02:50,959 vab I see a lot of pieces to a puzzle 81 00:02:54,490 --> 00:02:52,700 that have to go back together here are 82 00:02:56,350 --> 00:02:54,500 some of them ready to go already yes for 83 00:02:58,120 --> 00:02:56,360 example the for December that we have 84 00:02:59,979 --> 00:02:58,130 over here is ready for flight and it's 85 00:03:02,080 --> 00:02:59,989 been prepared it's been checked out and 86 00:03:04,690 --> 00:03:02,090 is ready for transfer for the march two 87 00:03:05,890 --> 00:03:04,700 thousand seven flight and what else has 88 00:03:07,960 --> 00:03:05,900 to happen to these before they're ready 89 00:03:09,190 --> 00:03:07,970 to go well for example we've got painted 90 00:03:10,930 --> 00:03:09,200 structures which have just come over 91 00:03:13,930 --> 00:03:10,940 from hangar AF which you saw the in 92 00:03:15,430 --> 00:03:13,940 process over there and parachute pack is 93 00:03:16,630 --> 00:03:15,440 an example as well that we have to 94 00:03:18,309 --> 00:03:16,640 integrate with the with the flight 95 00:03:20,440 --> 00:03:18,319 vehicle the structures that come over 96 00:03:22,990 --> 00:03:20,450 have to be insulated we have a robotic 97 00:03:24,550 --> 00:03:23,000 spray on insulation system that puts 98 00:03:26,559 --> 00:03:24,560 installation on the structures and we 99 00:03:29,170 --> 00:03:26,569 assemble them we install electronics in 100 00:03:30,940 --> 00:03:29,180 the inside of them and then check it all 101 00:03:32,620 --> 00:03:30,950 out make sure it's ready to go for 102 00:03:34,270 --> 00:03:32,630 flight and it takes a lot of people to 103 00:03:37,180 --> 00:03:34,280 do all that work for Marshall right you 104 00:03:38,530 --> 00:03:37,190 sure does we have about 850 contractor 105 00:03:40,180 --> 00:03:38,540 and civil servant folks supporting 106 00:03:41,379 --> 00:03:40,190 Marshall down here all right and then 107 00:03:43,240 --> 00:03:41,389 you get it all ready to go and it goes 108 00:03:44,860 --> 00:03:43,250 to VA be right that's correct we send it 109 00:03:46,569 --> 00:03:44,870 over there and they integrate it with 110 00:03:49,449 --> 00:03:46,579 the flight vehicle thanks for showing us 111 00:03:50,830 --> 00:03:49,459 around thank you now we moved over to 112 00:03:52,599 --> 00:03:50,840 the rotation processing and search 113 00:03:54,370 --> 00:03:52,609 facility and i'm here with kenton bush 114 00:03:56,170 --> 00:03:54,380 he's a marshal representative with a 115 00:03:57,729 --> 00:03:56,180 reusable solid rocket booster project 116 00:03:59,229 --> 00:03:57,739 and can tell me what we're looking at 117 00:04:01,270 --> 00:03:59,239 here and what you do in this building 118 00:04:03,789 --> 00:04:01,280 okay this is a left F center segment 119 00:04:06,160 --> 00:04:03,799 that's behind us it was recently shipped 120 00:04:09,280 --> 00:04:06,170 here from Utah along with seven other 121 00:04:12,250 --> 00:04:09,290 segments it was brought in via rail they 122 00:04:13,509 --> 00:04:12,260 took it off from that railroad before 123 00:04:15,610 --> 00:04:13,519 but before they did that actually did a 124 00:04:17,110 --> 00:04:15,620 grain inspection rotated that to 125 00:04:18,550 --> 00:04:17,120 vertical they're doing the bare metal 126 00:04:21,069 --> 00:04:18,560 inspections here if there's any issues 127 00:04:22,960 --> 00:04:21,079 we work with the KSC ground ops 128 00:04:24,969 --> 00:04:22,970 personnel to resolve a lot of those 129 00:04:27,560 --> 00:04:24,979 issues and what is Marshall's role here 130 00:04:29,720 --> 00:04:27,570 Marcia's role is we are 131 00:04:32,420 --> 00:04:29,730 you know engineering support to make 132 00:04:35,390 --> 00:04:32,430 sure that the design requirements are 133 00:04:37,250 --> 00:04:35,400 met for the overall motor and for the 134 00:04:38,510 --> 00:04:37,260 overall solid rocket booster so these 135 00:04:40,190 --> 00:04:38,520 folks are getting it all ready to go to 136 00:04:42,440 --> 00:04:40,200 the VA be right that's exactly right 137 00:04:43,940 --> 00:04:42,450 once it's ready once they put do all the 138 00:04:46,670 --> 00:04:43,950 processing that they need to like build 139 00:04:48,620 --> 00:04:46,680 up the booster they'll take it over to 140 00:04:50,420 --> 00:04:48,630 the vab and they'll stack it you know 141 00:04:52,190 --> 00:04:50,430 one after the other and get it ready for 142 00:04:53,480 --> 00:04:52,200 flight alright sounds like they've got a 143 00:04:54,260 --> 00:04:53,490 lot of work to do in there we'll let you